Deliver Your News to the World

Eni completes its 2017 drilling campaign in Area 1, offshore Mexico, with another successful well and increases the hydrocarbon in place estimate to 2 billion barrels

Thanks to the results of this well and the revision of the reservoir models of the Amoca and Miztón fields, the hydrocarbon in place estimate for Area 1 is boosted from 1.4 to 2.0 billion barrels (Bboe), of which approximately 90% oil and the remaining associated gas.


San Donato Milanese (Milan) – WEBWIRE

Eni successfully drilled the Tecoalli 2 well, in the shallow waters of the Campeche Bay, offshore Mexico. Thanks to the results of this well and the revision of the reservoir models of the Amoca and Miztón fields, the hydrocarbon in place estimate for Area 1 is boosted from 1.4 to 2.0 billion barrels (Bboe), of which approximately 90% oil and the remaining associated gas.

The Tecoalli 2 well, located in Contractual Area 1, approximately 200 km west of Ciudad del Carmen, in 33 m of water depth, reached a final depth of 4420 meters encountering approximately 40 meters of net oil pay in the Orca formation, characterized by excellent quality sandstone reservoirs. The well was then deepened to the Cinco Presidentes formation exploratory target, finding further 27 meters of net oil pay. A production test will now be executed and then the well will be temporarily abandoned. The Tecoalli field sits 24 km from the Amoca field and 13 km from the Miztón field.

Eni will shortly submit the Development Plan (PoD) for Area 1 to the approval of the local authorities (Comisión Nacional de Hidrocarburos – CNH). As soon as the PoD is approved, Eni will sanction the development (FID), with production startup planned in first half 2019.

Eni is present in Mexico since 2006 and established its wholly owned subsidiary Eni Mexico S. de R.L. de C.V. in 2015. Eni holds rights in 4 exploration and production blocks in the Sureste Basin, all as Operator: Area 1 (Eni 100%), obtained in 2015 with the “Ronda 1- Licitación 2”, and Block 7 (Eni 45%), Block 10 (Eni 100%), Block 14 (Eni 60%), obtained in 2017 with the “Ronda 2 – Licitación 1”.


( Press Release Image: https://photos.webwire.com/prmedia/6/217723/217723-1.png )


WebWireID217723





This news content was configured by WebWire editorial staff. Linking is permitted.

News Release Distribution and Press Release Distribution Services Provided by WebWire.